|
Sample Layout |
|
|
Notes: The existing layout was the product of equipment being acquired and placed where space was available. Process flow and Lean Manufacturing principles were not considered.
Does this sound Familiar!!! Notes: This Re-Engineered layout was derived from Through Put Evaluation, Process Value Stream Mapping, and implementation of Cellular Manufacturing.
Equipment number 6 is a New acquisition. The Old number 6 was retired. Equipment number 11 is a relocation from another department. The new layout did not require any additional square footage.
Output was increased by 35% through the elimination of Non-Valued Added Steps. |
|
Send mail to
webmaster@northeastdesigndrafting.com with
questions or comments about this web site.
|